Join AOGdigital on Facebook Join AOGdigital on LinkedIn Join AOGDigital on Twitter

 

Trelleborg supplies NC3 floatover equipment

By  AOG Staff Monday, 17 October 2016 12:20
Rate this item
(0 votes)

Trelleborg’s engineered products operation has delivered the floatover equipment for the Petronas NC3 gas field, located in Block SK316, 200km north of Bintulu, Sarawak in Malaysia.  

Trelleborg provided PAPE Engineering, an engineering company responsible for the transportation and installation of the platform jacket and topside, with four leg mating units (LMUs), as well as four sway fenders, four loadout pads and four deck support units (DSU).  

The LMU installation was performed at the fabrication yard before the floatover operation commenced. 

“Trelleborg site service engineers were able to provide supervised on-site support, ensuring a seamless LMU installation within the topside of the Central Processing Platform,” said Olivier Beauclair, director for platform transportation and installation, PAPE.

 

Read 5088 times