Join AOGdigital on Facebook Join AOGdigital on LinkedIn Join AOGDigital on Twitter

 

Key Petroleum approved for Dunnart-2 operations

By  AOG Staff Wednesday, 22 April 2015 13:38
Rate this item
(0 votes)

Key Petroleum announced that all required approvals have been granted by the Department of Mines and Petroleum to undertake completion and testing operations at Dunnart-2 in exploration permit EP437, Perth Basin, onshore Western Australia.

All long lead items including pup joints and tubulars, wellhead-equipment including, xmas tree, tubing hanger, gauges and valves are in Perth ready to be mobilized to the Dunnart-2 location.

Later this week, DCA Rig #6 will be inspected and moved to the Dunnart-2 location within three weeks. Camp facilities have been setup and completed south of Dongara at Key’s operations base and onsite office and generator power facilities will shortly be mobilized from the operations base.

Key is also in discussion with two other oilfield rig contractors regarding a larger campaign in the Perth Basin, and assessing whether any of their rigs could be utilized to undertake any workover activities at West Kora-1 and Stokes Bay-1 in the Canning basin.

Image from Key Petroleum

 
Read 4422 times