In this video, Chevron shows behind the scenes at the Bangka project, offshore Indonesia.
The project includes a subsea connection to a floating production unit (FPU) and has a design capacity of 110 MMcf of natural gas, and 4000 b/d of condensate. First gas was achieved in August 2016.
Bangka is in the Kutei Basin in East Kalimantan.
Chevron has a 62% interest in the Bangka project. Partners Eni hold 20%, and Tip Top holds 18%.