Join AOGdigital on Facebook Join AOGdigital on LinkedIn Join AOGDigital on Twitter

 

Lukoil completes eighth well at Vladimir Filanovsky

Written by  AOG Staff Saturday, 28 October 2017 19:32
Rate this item
(0 votes)

Lukoil has completed the drilling of its eighth well at Vladimir Filanovsky field in the Caspian Sea, Russia. 

This is a horizontal well with a 1560m section, producing 2.8 thousand tonnes per day.

As a result, the project's total production reached 16.5 thousand tonnes of oil per day, or 6 million tonnes on an annualized basis. At present, there are six producing wells and two water injectors in operation at the field.

Within the Phase 2 of the field development plan, construction and individual equipment testing work at a fixed ice-resistant platform, the accommodation block platform, and the connecting bridge will have been completed by the end of 2017.  In addition, drilling complex and systems are planned to be put into operation. 

Image: Lukoil

Read 3104 times